Integration & strategy
Where can CIMCO software reduce lean manufacturing waste?
Updated
DNC-MaxMDC-MaxMDM
Direct answer
DNC can reduce walking and waiting for programs, MDC can expose idle time and recurring delays, and MDM can reduce defects and rework caused by the wrong revision or missing documents. The strongest projects connect one observed waste to a measurable workflow change instead of treating software installation as the improvement itself.
Practical checkpoint
Baseline the current minutes, errors, travel, queue time, or scrap for one workflow and measure the same indicator after adoption.